INDONESIA HYDRO™ CONSULT
Bukit Golf Riverside II Block B01 No 46
Gunungputri, Bogor, West Java 16963
Indonesia
ph: +62 21 84303098
consult
INDONESIA HYDRO™ CONSULT provides consulting service at every step of hydro development projects. Our abundant experiences, resources, data, research, hardwares and softwares make us capable to produce quick, accurate, optimized, comprehensive, efficient and cost-effective solutions for your business.
Site identification of potential sites and reconnaissance studies of cost-effectiveness of sites.
Approximate time: 2 weeks.
Quick Count: Preliminary assessments of sites to estimate site potential, preliminary estimate of project cost and preliminary feasibility of project sites. Our abundant collections of maps, hydro-meteorological data and hydropower plant database are very useful to do the assessments. SimPower* software is used in the analysis.
Approximate time: 3 weeks.
Feasibility assessments of project sites including hydrological analysis, site surveys and investigations, project layout and basic design, project cost estimates and project financial feasibility.
Approximate time: 5 months.
Basic and detailed design of project sites including preparation of engineering calculations and analysis, basic and detailed drawings, bill of quantities, project cost estimates, technical specifications, bid documents and artist's impressions.
Approximate time: 3 months.
Site surveys and investigations to support project preparations including topographic surveys, geological and geotechnical investigations, construction material surveys and hydrological observations.
Approximate time: 2 month (topographic survey), 3 months (geological and geotechnical investigations).
Engineering assistances to support procurement and construction activities of projects.
Approximate time: construction period.
Management of projects including initiation, planning and design, execution and construction, monitoring and controlling systems, and completion of projects.
Approximate time: project development period.
Management in construction works to optimize use of available funds, control the scope of the work, control the project schedule, optimize use of design and construction firms' skills and talents, avoid delays, changes and disputes, enhance project design and construction quality, optimize flexibility in contracting and procurement; and manage project cash flow.
Approximate time: construction period.
Detailed technical examinations of projects be-fore becoming involved in business arrangement.
Approximate time: 2 weeks.
Evaluations of proposed projects to be developed to assess their favorability for investments.
Approximate time: 2 weeks.
Evaluate the bankability of projects from technical point of view.
Approximate time: 1 month.
INDONESIA HYDRO™ CONSULT
Bukit Golf Riverside II Block B01 No 46
Gunungputri, Bogor, West Java 16963
Indonesia
ph: +62 21 84303098
consult